CTRL Collective

Location
Denver, Colorado

Architect
Studio B2SJ

Jordy Construction was selected by interview and low responsible estimate by McWhinney Development, Studio B2SJ, and CTRL Collective. This was a full build out of the 3rd floor of the newly constructed Dairy Block Building in lower downtown Denver. The job boasts a very high level of finish. Jordy Construction installed full electrical systems with high lighting and control panels. The HVAC system was branched off of the existing building system while Jordy provided the control system. There was a full bathroom group added. This project required exemplary communication as the owner was out of town and did not attend regular meetings. Jordy documented all site conditions meticulously. Jordy Construction has worked for the architect for over 20 years and understands their high standard of quality and finish specifications. As time has moved forward in this building, Jordy Construction continues to gather more work from the building team.